1
|
Bhusan Power & Steel Ltd.
|
Sambalpur
|
Telkai, Lapanga
|
15-May-2002
|
15.00
|
3.00
|
55000.00
|
42671.00
|
In Operation, Plant is going for Expansion from 5 MTPArnto 15 MTPA with a Total investment of 55,000 Crore
|
2
|
Tata Steel BSL Limited (Formerly Bhushan Steel
|
Dhenkanal
|
Meramandali
|
03-Nov-2005
|
6.00
|
6.00
|
20804.00
|
42000.00
|
In Operation
|
3
|
Arcelor Mittal Nippon Steel India Ltd.
|
Jagatsinghpur
|
Benefication Plant at Dabuna, Keonjhar and Pellet Plant at Paradeep
|
21-Apr-2005
|
6.00
|
6.00
|
10724.00
|
5802.39
|
In Operation, Producting Pellet of 12 MTPA InstalledrnCapacity. The biggest Pellet Complex in India.
|
4
|
Jindal Steel & Power Limited
|
Angul
|
Pellet plant at Deojhar,Keonjhar and Steel Plant at Angul
|
03-Nov-2005
|
6.00
|
6.00
|
13135.00
|
24744.00
|
In Operation, Plant is going for Expansion of its 6 MTPArnExisting Integrated Steel plant from proposed capacityrnof 18.6 MTPA to 25.20 MTPA with Total Investment ofrn24,652 crore
|
5
|
TATA Steel Ltd.
|
Jajpur
|
Duburi, Kalinganagar
|
17-Nov-2004
|
8.00
|
3.00
|
47599.00
|
23319.00
|
In Operation, The Plant is going for Expansion of itsrnCrude Steel Production from 3 MTPA to 8 MTPA with arnTotal Investment of 47,599 Crore.
|
6
|
Rungta Mines Ltd.
|
Dhenkanal and Keonjhar
|
Jharabandha and Karakehendra
|
03-Nov-2005
|
10.55
|
0.50
|
18921.00
|
713.00
|
Plant is going for Expansion of its Intregrated SteelrnPlant from Proposed capacity of 2.85 MTPA to 7.55rnMTPA at Dhenkanal and from 0.53 MTPA to 3 MTPA atrnKeonjhar with total investment of 18,921 Crore. Whilernthe other Steel Plants of the Company atrnKamandha(0.35 mtpa), Sundargarh andrnKarakhendra(0.15 mtpa), Keonjhar are already inrnOperation
|
7
|
Shyam Metalicks and Energy Ltd.
|
Sambalpur
|
Pandloi, Rengali
|
09-Feb-2004
|
2.10
|
0.50
|
2075.00
|
1107.00
|
In Operation, SMS-1.6, DRI-0.55, Blast Furnace-0.39rnMTPA, Pellet 1.8 MTPA, Rolling Mill-0.9 MTPA, SinterrnPlant-1.3 MTPA
|
8
|
Jindal Stainless Ltd.
|
Jajpur
|
KalingaNagar
|
09-Jun-2005
|
3.10
|
1.10
|
23625.00
|
9923.00
|
In Operation, Crude Stainless-2.1 MTPA, Rolling Mill-1.6rnMTPA.
|
9
|
Jindal Steel Odisha Ltd
|
Angul
|
|
15-Dec-2021
|
19.20
|
0.00
|
97070.00
|
0.00
|
The total investment includes the investment for a 12.5rnMTPA cement plant
|
10
|
JSW Utkal Steel Ltd
|
Jagatsingpur
|
Godkujang, Nuagaon, Dhinkia
|
02-Jun-2017
|
12.00
|
0.00
|
50000.00
|
0.00
|
At Project Stage. 12 MTPA Steel with 32 MTPA PelletrnPlant
|
11
|
Arcelor Mittal Nippon Steel India Ltd.
|
Kenderapada
|
Mahakalapada
|
17-Dec-2021
|
24.00
|
0.00
|
102275.00
|
0.00
|
Approved by State Govt.
|
TOTAL |
111.95 |
26.10 |
441228.00 |
150279.39 |
|